Mark 1. I've attached a copy of the drop locations that our computers would be connected to for testing. (There are 3 pages to that document.) 2. Computer drop ID 7/6/2007 3:07:00 PM (GMT-4:00) Eastern Daylight Time, Logged by: Wilson, Isaac, Jr - B101-F1-ECM-6 Unclass (F-Lab) = Both channels, a & b are activated and connected to the switch B101-F1-ECM-7 Unclass (F-Lab) = "a" channel is activated and connected to the switch B101-F1-CR-E133 Class (Y-Lab) = Deactivated, not connected the switch B101-F1-CR-E152 Unclass (Y-Lab) = Deactivated, not connected the switch B101-F1-CR31 Unclass (Y-Lab) = Deactivated, not connected the switch B101-F1-CR-144 Unclass (Y-Lab) = Deactivated, not connected the switch CR#26 (LowBay) = Activated and connected to switch. B101MEZZ-CAB-E2 Unclass (Chamber 3b) = All channels are connected but disabled. B101MEZZ-CAB-E3 Unclass (Chamber 3b) = Channels a, b, and c are activated and connected to the switch excerpt channels d,e and f B101MEZZ-CAB-E3 Unclass (Chamber 3b) = channels d,e and f connected to switch but are disabled. 3. Order for upgrading HD's in computers. See attached spread sheet. Bill William R. Husser ITT Industries Space Systems Division 2696 Manitou Rd Bldg 101 Rochester NY 14606-0488 585-269-7379 Pager 585-521-2964